Residential Glazing
Rocklin Window Units During Construction
Window units set into green-sheathed walls at a Rocklin building under construction. Photos show a wide band and a single unit, with bare ground outside.
- Service
- Residential Glazing
- Location
- Rocklin
- Completed
- May 15, 2026
Key takeaways
- Wide window band in green sheathing.
- Single window unit on a side wall.
- Ground and interior still unfinished.
Scope of work
Photos show the wide window band on the front wall and a single unit along the side, both set into green sheathing.
Materials and glass type
White window frames, clear glass and green exterior sheathing.
Challenges and notes
Photos show bare ground, offcuts and an unfinished interior beyond the glass.
Result
Photos show the window units fixed in the sheathed walls, with the building still under construction.